Home Production Management Trainer HomeOverviewTactical PlanningOperative PlanningMiscellaneousGerman Pages
 

Simulation of a flow line with limited buffers

An asynchronous flow line with up to 5 single-server stations and limited buffers is simulated. The simulation is event-based. Processing times may be exponential, normal- or gamma-distributed.

Literature:

- Tempelmeier (1991)


Copyright ©2006 POM Prof. Tempelmeier GmbH All rights reserved. | About Us | Contact | Impressum |