Home Production Management Trainer HomeOverviewTactical PlanningOperative PlanningMiscellaneousGerman Pages

Dynamic lot sizing: Groff procedure

The Single-Level Uncapacitated LotSizing Problem (SLULSP) is computed with the heuristic procedure due to Groff.


t,i indices of periods
s setup costs
h holding costs
D(t) demand in period t
q(t) lot size in period t
v critical value


  • deterministic dynamic demands
  • deterministic setup costs and holding costs
  • no capacity consideration


- Tempelmeier (2005)

Copyright ©2006 POM Prof. Tempelmeier GmbH All rights reserved. | About Us | Contact | Impressum |